Submitted by guillaume3 on Thu, 02/18/2016 - 07:00 With water lines and drains, as well as the grease trap, a lift pump and electrical conduits still needing to be buried, Harrell Smith had to break the concrete in the back of the building to fit all that stuff in. Share to: Facebook Twitter Myspace MSN Live Yahoo LinkedIn Orkut Digg Delicious Google Plus